Throughout our first sprint, Our entry point to the project was developing the snapshot mechanism and snapshot strategy as this part will tie all the PDAs together and makes it possible to carry out the vote.
Moreover, as we began to visualize the architecture of the system we figured a batter flow for the staking credential, this flow will require less development effort and has a more streamlined user experience. The details of which has been outlined in the Validator Dev Plan v2 document.
The new dev plan removes the need for some of the components such as recalculation module and APIs in backend, local db, and frontend entirely.